•  
  •  

All Categories


thumb
Ok, so start with removing the 6 screws to seperate the Boiler and Body from the Chassis. careful with a couple of delicates that need pulling out. Remove the black and red wires carefully and all their attachments.  The only wires left should be the power to motor and feedback for the chuff S...
Experiments & Preliminary Work Within a few days of owning my Live Steam 2 Cylinder Open Cab Shay I was convinced that an R/C installation was going to be necessary. Even though the Shay is very easy to keep up with and control by hand, the design of my railroad made that impractical. Each run r...