      A two-car rail bus that needs a custom paint job for the Sprite City Transit Authority. It's a Hartland Locomotive Works Doozie, and a Bachmann Big Hauler combine. It'll be the street car for the "city" line of the layout. 
       
       
       
       
       
       
    • May 15, 2018 10:37 PM EDT
      • Peeples Valley, Arizona
         
      • Posts
        248
      • Thanks
        66
      • Thanked
        41

      Here's where the rail bus is at the moment. Probably won't get any more done until next week.

       

       

       

    • May 16, 2018 12:29 AM EDT
      • Missouri
         
      • Posts
        2,247
      • Thanks
        118
      • Thanked
        162

      Copper tops on lamp vents are a nice touch.

    • May 21, 2018 10:41 PM EDT
      • Peeples Valley, Arizona
         
      • Posts
        248
      • Thanks
        66
      • Thanked
        41

      Dragon bus is almost done. Still a few parts drying. Smoke unit is installed. Still have to reinstall the decoder, wire everything in, and pipe the smoke unit to the dragon's head. I also have to seal the head so the smoke comes out the mouth and nostrils. Oh, I also have to build and install a couple of switches to control smoker and the fan.

       

       

       

    • May 21, 2018 11:24 PM EDT
      • Missouri
         
      • Posts
        2,247
      • Thanks
        118
      • Thanked
        162

      Daniel Collins said:

      Still have to ...

      I also have to ....

      Oh, I also have to ....

      There's always something!  Looking good.

    • May 23, 2018 12:21 PM EDT
      • Peeples Valley, Arizona
         
      • Posts
        248
      • Thanks
        66
      • Thanked
        41

      Almost ready to wire things back in. Smoke unit is plumbed. I have to put in a switch and fuse for the fan and smoker. I used screen for the windows, instead of plastic, so the smoke unit would have plenty of air. The dragon head is sealed. I have not put hand rails back on yet, as I forgot them until I looked in the parts box and went "Oh, heck!"

Forums Modeling Motive Power

    Icon Legend

  • Topic has replies
    Hot topic
    Topic unread
    Topic doesn't have any replies
    Closed topic
    BBCode  is enabled
    HTML  is enabled

Add Reputation

Do you want to add reputation for this user by this post?

or cancel

Ads by Google